InternalBanner-Powerline-02

Namewaminikan (Run of the River) Hydro Electric Generation Project

POWERLINE

Namewaminikan (Run of the River) Hydro Electric Generation Project

Project-Powerline-04

Description:

  • Complete Water to Wire project (W2W)
  • 25km of transmission line, Substation, turbines and, control system.
  • 2 generating stations
  • 10MW Output

Project Info

Category:
Date: