Over the past 4 years GRIDLINK has grown within the Canadian Pacific Railway. Seen here is the restoration of a eroded bank found within a 2km stretch in a remote area. GRIDLINK’s goal was to tackle the increased danger of wash-outs in the area that threaten the railway along this 2km stretch. GRIDLINK was to the task. This project involved organizing equipment, material, personnel and environmental challenges.